Rollback Readiness Card

S. West
2 hours ago
5 min read

The rollback ran as documented and the old version was back in four minutes. The incident lasted two more hours.

One Tuesday a regional healthcare provider's notification service released a changed message format. At 21:10 the error rate crossed the trigger and the on-call lead called the rollback. About forty thousand new-format messages were already queued, and the restored code could parse none of them, so consumers crashed, retried and requeued them. The fix took three days: tag each message with a format version and let consumers ignore unknown ones.

(Composite example, assembled from patterns common in teams whose rollback plans cover only the code. The provider is not a real organisation and the figures are illustrative.)

Many teams rehearse reverting the code and never check the other four things a rollback has to restore. This card starts from what the change leaves behind, then moves the hard decisions to design time, when they cost days rather than an incident. Use one card per change: at design review, in the change template and before release.

Step 1: scope it by what the change writes

A rollback has to cope with everything the new version did while it ran. Tick each row and record what is really there.

☐

What has to come back

Prompt

Your answer

☐

Code

Can we redeploy the previous version? Everyone practises this half.

______

☐

Configuration

Does a setting live outside our deploy, such as a vendor toggle? Who reverts it?

______

☐

Data

Which rows get written, in what shape? Can the old code read them?

______

☐

In-flight work

What waits in queues, jobs or retries in the new format?

______

☐

Things that left the building

Which emails, webhooks or payments go out? How do we compensate?

______

Test: list every row, message, file and outbound call your latest change produced. That list is your rollback scope.

Step 2: name the rung

"Which rung?" beats "is it risky?" because the rung can be checked. Stop at the first yes.

  1. Sends, charges or hard-deletes something external? Rung 5.

  2. Transforms existing values in place? Rung 4.

  3. Writes anything in a shape the old code cannot read? Rung 3.

  4. Adds schema the old code can ignore? Rung 2.

  5. Stateless, no schema or data change? Rung 1.

  6. None fit? Finish Step 1 and retry.

This decision path is a helper we derived from the ladder in Rolling Back a Change Safely. If the two ever disagree, the ladder table below wins.

Rung

Example

Rollback means

Required action

☐

1. Trivially reversible

Stateless service

Redeploy the prior version

None

☐

2. Reversible with care

New column the old code ignores

Revert code, keep schema

Stay additive

☐

3. Reversible with data work

Column renamed or its type changed

Revert code, then undo schema

Split into two deploys

☐

4. Hard to reverse

In-place value migration

Restore the migration snapshot

Take it and test the restore

☐

5. One-way door

Message sent, card charged, hard delete

Compensation only

Decide before shipping

☐

Rung: ______ Named independently by: ______ and ______

If the two names differ, stop and settle it: that disagreement is the review's most useful output. In our experience, changes that seem dangerous usually sit on rungs one or two.

Step 3: move it down one rung

Reversibility is a design choice. Tick each move that applies.

☐

Move

What it buys

Cost

☐

Additive schema: add, deprecate, drop later (expand–contract, Parallel Change on martinfowler.com)

Rung 3 becomes rung 2

One extra deploy

☐

Two-phase data: write both shapes, read the old, then switch the read

Phase-one rollback is a config change

Two deploys

☐

New behaviour behind a feature toggle (Hodgson), off by default

Anyone on call can flip it, with no deploy

In our view, the highest-leverage move

☐

Idempotent operations

Re-running during recovery is safe

______

☐

Versioned or drained queue

Queued work survives a revert

The composite's three-day fix

Decision rule: if lowering the rung takes less than a day and anything shared is touched, spend the day.

Step 4: pre-decide the trigger

People deciding mid-incident least want a rollback to be needed, so decide now. All four parts are required.

☐

Part

Fill in

Not acceptable

☐

Observable threshold

e.g. 5xx above 1% for three minutes: ______

"If it looks bad"

☐

One named authority

______

A committee or "whoever's on"

☐

Fix-forward time-box

e.g. one attempt, ten minutes: ______

Open-ended attempts

☐

Default

Roll back when in doubt

Debating it live

Test: in your last incident, how long passed between rollback first being raised and it happening?

Step 5: check when rolling back is wrong

Tick any case that could apply and write the alternative.

☐

Case

Why reverting hurts

Alternative

☐

Rollback is riskier than staying

A half-applied migration can revert into a state neither version understands

______

☐

A one-way door has closed

Reverting does not unsend anything

______

☐

Both systems live mid-migration

Users told they moved get moved back

______

☐

A dependency failed

Reverting adds variables and fixes nothing

______

☐

A truly understood one-line fix

Rare: many 3am one-liners turn out to be hypotheses

______

  • ☐ The release communication plan has a rollback message row: who is told, what, when and how. Many plans leave this row out.

Card summary

Field

Entry

Change

______

Rung

______

Move applied

______

Scope gaps found

______

Threshold, authority, time-box

______

Cases where rollback is wrong

______

Rollback message owner

______

This week: run a rollback

  • ☐ Revert a recent rung two or three change in staging and time it.

  • ☐ Note what only appears in practice: cached connections, queued work in the new shape, config your deploy never touches.

  • ☐ Add one question to the change template: what rung is this on, and what single move would lower it?

How to use it

  • Who: the change author, a reviewer who knows the data and integrations, and the on-call owner for Step 4. In our experience a first card takes under an hour.

  • Output: a named rung, any move applied, a four-part trigger and the cases where rollback is wrong.

  • Done when: two people named the same rung, the trigger is complete, and the rollback has been run in staging.

Where this changes

A small team can use Steps 2 and 4 alone for rung one and two changes, and the full card when a change writes data or touches a queue. Regulated or larger organisations should attach the card to every change request, keep it as release evidence and link the trigger to their incident response runbook. Rehearse the trigger in a game day. The reasoning is in Rolling Back a Change Safely.

Final takeaway

A rollback restores more than code, and its reversibility is settled at design. Name the rung, lower it where a day allows, and write the trigger down before anyone is tired.